System Improvements at 29th and K
Washington, DC 20007


Project Overview:

We are replacing a portion of the protection system to improve the safety and reliability of natural gas service for the entire Washington, D.C., metropolitan region. This project is just one of many infrastructure improvements being made across the region.

Construction will occur within the construction fenced areas at the following sites:

Site 1: In the green space on the north side of K Street, NW, just east of the garage entrance to 1001 30th Street NW, Washington DC 20007.

Site 2: On Capital Crescent Trail west of 34th Street, near the temporary construction trailers.

The images below shows the approximate locations of construction. All work is permitted by National Parks Service and the District Department of Transportation.

 

Sustainability in Action              

This project will use state-of-the-art equipment to capture and reinject natural gas into the system, thereby mitigating methane emiss
ions.

Project Area:

SPID166

 SPID166

 

Planned Construction Activity:

Construction is planned to start as early as May 15, 2019 and is expected to be completed by July 2019. Construction schedules may be affected by weather and other unforeseen circumstances. As permitted, work will typically be performed between 9:00 a.m. and 5:00 p.m. Monday through Friday.

What to Expect During Construction: 

Garage access will be maintained at all times. You can expect to see Washington Gas and contractor vehicles and equipment, and you may hear construction noise. For your safety, do not enter construction areas or approach vehicles or equipment.

Restoration Plans: 

Temporary restorations will be made immediately following the completion of this construction project. Permanent restorations will be made in compliance with the permit and will occur 30-45 days after all work is completed, weather permitting. Washington Gas will restore to pre-construction conditions.

Washington Gas makes every reasonable effort to minimize disturbance in your community. If you have questions or need additional information about this project, please email community@washgas.comProject reference number: SPID166

Thank you for your patience as our construction crews perform this important work in your community. 
 