Meter Set Quiet Test

The Process: (Small commercial meter sizes 250 to 425)

  • If you are a business owner, please refer to the commercial meter set form and follow the instructions on the form.
  • Please be sure to check that your underground service has been installed prior to sending the completed form to contractorservices@washgas.com
  • For small diaphragm meter sizes 250 to 425 the meter rack will be installed when the underground service is installed. If you don’t have a meter bar, please request a meter bar for your licensed plumber to tie into upon submission.
  • The contractor services team will review the form for completion along with any included attachments to initiate the meter set process, e.g., picture of the local code authority or county inspection and picture of the interior gas piping (houseline) connected to the WG meter bar.
  • If all items requested are reviewed and validated the contractor services team will create the service order and provide a notification to the sender of whom the order is assigned to with the expected meter set date. **Please be advised that it may take up to seven days for your meter to be set.
  • For further information please refer to contractorservices@washgas.com
The Process: (Large commercial rotary meters 1.5M and larger)

  • If you are a business owner, please refer to the commercial meter set form and follow the instructions on the form.
  • Please be sure to check that your underground service has been installed prior to sending the completed form to contractorservices@washgas.com
  • For larger meter sizes such as 1.5M - 16M and above, the contractor services team will create the meter set order and coordinate with the contractor rough in team to install the meter rack to support the meter installation.
  • Once the meter rack and meter have been installed, the flow of gas will be locked off until submission of the local code authority or county gas line inspection has been received and validated. To have the lock removed, please reach out to the contractor services team, and have the approved gas inspection printed out for the technician to validate when onsite.

Commercial Meter Form

 
Your initials for each item below indicate the item is complete. All items MUST be complete for the meter to be set.
 
For commercial meter(s) please Confirm the following:
(Please attach a picture demonstrating this is complete to expedite scheduling.)


PLEASE BE ADVISED THAT IT MAY TAKE UP TO SEVEN DAYS FOR YOUR METER TO BE SET.

Additional Information:
For meter status prior to order creation, meter set attempt, or general meter inquires.
Please reach out to contractorservices@washgas.com. Our team will respond in 48hrs.

Contact information to reschedule your meter set due to incomplete site readiness.
MD/DC small residential meter sizes
Williams Construction and Meter services
VA small residential meter sizes
Precision Pipeline Solutions
MD/DC/VA Large meters sizes
Western Shores

Meter Set Address City State Zip Code Lot/Suite No. 2 PSI

To complete the form, please visit this site on a desktop computer

The Process:
  • Check that your underground service and rack were installed before sending the completed form to Contractor Services.
  • Contractor Services will assign one of our specialists to coordinate with you and the meter set contractor to ensure site readiness.
  • Site readiness requires:
    • Meter rack installation
    • Step down regulator(s) installed if applicable.
    • Tie in by your plumber/gasfitter to each individual rack.
    • Appliance lines valved off and capped or connected to the appliance.
    • Proof of the local code authority or county passed gas line inspection.
  • For units that are ready for a meter, the houseline must be tied in and labeled per corresponding unit/suite number.

Multi Meter Form

Your initials for each item below indicate the item is complete. All items MUST be complete for the meter to be set.
For multiple meter racks concerning apartments and condominiums please follow the criteria below:
*Site readiness will be outlined by the completion of meter rack installations, step down regulator installations, tie in by your plumber/gasfitter to each individual rack and lastly providing proof of the local code authority or county passed gas line inspection in follow up email to contractorservices@washgas.com.

Please refer to single family residential bullet point requirements.

 

PLEASE BE ADVISED THAT IT MAY TAKE UP TO SEVEN DAYS FOR YOUR METER TO BE SET.

Additional Information:
For meter status prior to order creation, meter set attempt, or general meter inquires.
Please reach out to contractorservices@washgas.com. Our team will respond in 48hrs.
 

Contact information to reschedule your meter set due to incomplete site readiness.
MD/DC small residential meter sizes
Williams Construction and Meter services
VA small residential meter sizes
Precision Pipeline Solutions
MD/DC/VA Large meters sizes
Western Shores

Meter Set Address City State Zip Code Lot/Suite No. 2 PSI

To complete the form, please visit this site on a desktop computer

The Process:

For townhouses or duplexes where space is limited, dual meter racks whether horizontal or vertical may be installed.

  • Check that your underground service has been installed.
  • If the dual rack has not been installed by the above ground contractor, please reach out to contractorservices@washgas.com.
  • Once the dual rack is installed, please ensure the following for site readiness:
    • Dual rack installation
    • Step down regulator(s) installed if applicable.
    • Tie in by your plumber/gasfitter to each individual rack.
    • Appliance lines valved off and capped or connected to the appliance.
    • Proof of the local code authority or county passed gas line inspection.
  • Once all these items are complete and verified, you are ready to complete the meter set form and submit to contractorservices@washgas.com.

Dual Rack Meter Form

 
Your initials for each item below indicate the item is complete. All items MUST be complete for the meter to be set.
 
For residential dual meter rack installations please Confirm the following:
(Please attach a picture demonstrating this is complete to expedite scheduling.)
 

PLEASE BE ADVISED THAT IT MAY TAKE UP TO SEVEN DAYS FOR YOUR METER TO BE SET.

Additional Information:
For meter status prior to order creation, meter set attempt, or general meter inquires.
Please reach out to contractorservices@washgas.com. Our team will respond in 48hrs.

Contact information to reschedule your meter set due to incomplete site readiness.
MD/DC small residential meter sizes
Williams Construction and Meter services
VA small residential meter sizes
Precision Pipeline Solutions
MD/DC/VA Large meters sizes
Western Shores

Meter Set Address City State Zip Code Lot/Suite No. 2 PSI

To complete the form, please visit this site on a desktop computer

The Process:

If you are requesting a residential meter or meters, please fill out the meter set form (below) and submit to ContractorServices@washgas.com

  • The contractor services team will review the form for completion along with any included attachments to initiate the meter set process. **If the meter set form is incomplete or the site is not ready the form will be rejected, and a notification will be issued to the sender.
  • Please be advised it may take up to seven business days to set the meter.
  • For further information please refer to contractorservices@washgas.com

Small Residential Meter Form

Your initials for each item below indicate the item is complete. All items MUST be complete for the meter to be set.
For single family residential meter(s) please indicate the following:

*Note: For meter sizes above 425, the meter bar/rack must be requested?

*Note:The meter set order will only be scheduled once the contractor services team has received the required inspection document(s) indicating the local code authority has issued a “pass” for the gas inspection.

(Please attach a picture demonstrating this is complete to expedite scheduling.)

 

PLEASE BE ADVISED THAT IT MAY TAKE UP TO SEVEN DAYS FOR YOUR METER TO BE SET.

Additional Information:
For meter status prior to order creation, meter set attempt, or general meter inquires.
Please reach out to contractorservices@washgas.com. Our team will respond in 48hrs.

Contact information to reschedule your meter set due to incomplete site readiness.
MD/DC small residential meter sizes
Williams Construction and Meter services
VA small residential meter sizes
Precision Pipeline Solutions
MD/DC/VA Large meters sizes
Western Shores

Meter Set Address City State Zip Code Lot/Suite No. 2 PSI

To complete the form, please visit this site on a desktop computer