Strip 1 West Project

Strip 1 West on Leesburg Pike (Route 7)
in Fairfax County, VA

SPID39

Project Overview:

Washington Gas’ construction activities will replace approximately 6.5 miles of a 16-inch diameter natural gas pipeline with a new 24-inch diameter steel pipeline, and could include the installation of regulator stations and the replacement of distribution mains depending on the final layout of the new corridor. Michels, an industry-leading utility contractor, is the construction contractor performing the work.

The entire scope of this project will be within VDOT right-of-way, extending from Leesburg Pike (Route 7) and Bishop Gates Way in Herndon, Virginia, to Leesburg Pike (Route 7) and Tyco Road in McLean, Virginia.

Project Area:

Planned Construction Activity:

Project Phases and Schedule as of September 2019

Construction Notifications and Advisories:

Project Resources: